2d floor progress

Filed under: Roofs, Structure — Comments Off
August 12, 2010
Parapet wall
Gazebo Steel Columns

Guest Master Inside
Guest Master Balcony


Like this:

Like
Be the first to like this post.
Tags: Columns, concrete, Parapets, roof
Comments RSS feed

Comments are closed.

« Work around the house (panoramas)
Front Rock Progress »
  • Recent entries

    • Kitchen Plaster
    • Office Doors
    • Stairs diferent angles
    • Entry (north side)
    • Interior Fence Fundation
    • 2d Floor Vetibule
    • Front Rock Progress
    • 2d floor progress
    • Work around the house (panoramas)
    • Work around the House
  • Browse popular tags

    abs pipe block cemex ciclopeo Columns concrete elevation Excavation forms giesso hector hugo inserts layout plaster pour pouring rebar rock rocks roof septic Stairs travertino tridipanel unload walls waterproofing wood Wood Carving
  • Meta

    • Register
    • Log in
    • Entries RSS
    • Comments RSS
  • Friends & links

    • Blog at WordPress.com.
    • Blog at WordPress.com.
  • Pages

    • About Stillwater Properties en Loreto
    • About Us
  • Monthly archives

    • August 2010
    • July 2010
    • July 2009
    • June 2009
    • May 2009
Blog at WordPress.com. | Theme: Motion by volcanic.
[ Back to top ]
Follow

Get every new post delivered to your Inbox.

Powered by WordPress.com